Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | bath, ncn4 |
Date time: | 3.24pm, Monday 20th July, 2020 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Bath |
Cycleway markings on NCN route 4 in central Bath
Comments reflect the views of the original submitter only.